Power Generation Options for New Zealand

Sinclair Knight Merz Limited
[ Last Updated 18 January 2006 ]


The following table summarises the main findings of the report and lists generation opportunities that have been identified in the course of this study in terms of:

  • Capacity (MW)
  • Estimated Annual Output (GWh)
  • Year On Line with and without constraints imposed by RMA Process
  • Ease of Establishment (index 1 to 5)
  • Estimated Capital Cost $m
  • Estimated Operating & Maintenance Cost (p.a. $m)
  • Estimated Cost of delivered energy (c/kWh)
  • Relative Impact of Constraints

The cost estimates contained in the following table are generic, based on typical industry indices and should not be regarded as precise. The costs given are in 2003 New Zealand dollars, at a NZ/US$ exchange rate of 0.55, and provide a measure of comparative costs of different generation options and reflect certain assumptions.

Costs per kWh take into account typical load factors for non-thermal plant (hydro, geothermal and wind). For thermal plant, where the load factors is some cases may be very low for peaking plant (but cannot realistically be predicted), they take into account fuel and O&M costs but just assume the capital cost is recovered at 10% per annum without taking into account financing costs. For the non-thermal plant, the costs per kWh are the long term prices at which the projects are considered to be viable. They do therefore take into account project financing and profit, but, as stated above, do not include up-front establishment costs, which could be significant in a full financial analysis. Further details regarding the assumptions made in establishing these costs are included in Appendix B of this report.

The summary table also includes a relative assessment of applicable constraints on a Low/Medium/High basis relating to:

  • The Resource Management Act process
  • Fuel/Energy Resource constraints
  • Transmission constraints
  • Environmental constraints

The most encouraging aspect is that the existence of adequate energy resources in New Zealand is not a constraint on achieving sufficient capacity to provide security in the short term, with environmental impacts that most New Zealanders would consider to be acceptable, when compared with the alternatives.

At the present time, there are existing and potential constraints in the high voltage transmission system that are obstacles to new generation in some areas of the country. These are discussed further in Section 4 of the report.

Air quality and noise are issues for any generation close to urban areas.

The progress of many proposed geothermal and hydro development projects is constrained by the consent process. In many cases, the assessed environmental impact of these projects is low.

Summary

Potential MW (Ignoring time required for normal consent process)
Year
On-Line
w/o RMA
Sub-
total
Geo­ther­malIn­dige­nous
Gas
Co­gen­era­tionWindHydroEmer­gency
Gener­ators
Gas /
Dis­tillate
Tur­bines
Com­bined
Cycle
Gas
Tur­bines1
200364010116.58.504764200
2004460146602036002000
20059301251540155150040400
20066207500014400400
2007270150000117000
20084900000485000
20092600000262000
Total
(approx MW)
3670        

Opportunity

Ref.Po­ten­tial
Capa­city
(MW)
Ann.
Out­put2
(GWh)
Time to On-LineYear
On-Line
Ease of Est.
1 = easy
5 = dif­fi­cult 
Cap­ital
Cost
$m
O&M
 Cost
p.a.
$m
Est. Cost3
c/kWh
Con­straints
(Low-Med-High
+ = pos. envir. benefit)
with RMA
mon­ths
w/o RMA
mon­ths
with RMAw/o RMARMAFuel /
 Reso­urce
Trans­mis­sionEn­vir­on­men­tal
1Poihipi Geothermal - immediate option1080>60 ?020122003100.2<1M 0L
2Emergency Generators - Auckland401303-412003200310 15    
3Emergency Generators- Wellington16653-412003200310 15    
4Emergency Generators - Christchurch20803-412003200310 15    
5Te Rapa Dairy - cogen3.5273-61-32003200310.1 5-10N/aHLL
6Mangahao Hydro (committed)4522200320031com­mit­ted 6    
7Auckland Hospital Cogen (committed)54066200320031com­mit­ted 5-6    
8Southdown 4035-706-932004200314015-10    
9Otahuhu A (Double ending)5044-906-932004200315-100.515    
10Degussa, Gas engine1.5126-932004200312.50.156-13LLLL
11Stranded Gas Total - gas engines - various sites605006-93-420042003276 6-13    
12LandFill Gas total - gas engines - various sites252006-93-620042003218 5-10    
13Sewage Gas/Biogas - various locations201506-93-620042003230 5-10    
14Gas Turbines (Whirinaki or elsewhere) 2003200175-3506-93-4200420031see App A 15-25    
15Power Barge907006-94-620042003120-60 15-25    
16Kawerau GT4035-706-93-620042003245115-25    
17Ohaaki Deep Drilling Geothermal504206-96-9200420041262.52-30 0M
18Coal Seam Methane - Various sites - 2003101606-96-9200420032  8-10    
19Poihipi Geothermal - steam interconnect2823060 ?6-12200820041261.52-3M 0L
20Gas Turbines (Marsden A) 2004+200219-43812-186-12200520041see App A 15-25    
21Refinery Cogeneration2015012-1812200520042251.57LLLM
22Kawerau Wellhead Geothermal108036 ?6-12200620042330.86M  M ?
23Other Wellhead Geothermal129036 ?6-122006200433315-6H ?L
24Kawerau Binary Geothermal5401212200520041130.32-3L  +
25Rotokawa wellhead Geothermal54036 ?12200620042220.45-6M  L
26Rotokawa bottoming Geothermal320121220052004160.23L  0
27Mokai bottoming Geothermal8601812200520042160.63    
28Ohaaki bottoming Geothermal10801212200520041200.93L 00
29Tararua Wind Farm361251414200420041602.46LLLL
30Wairakei Binary Geothermal151201212200420041351.12-30 0+
31Hau Nui Wind Farm - expansion 517181820052005180.26LLLL
32Reporoa Geothermal40330> 60 ?12-4820122005412534-5H ?L
33Coal Seam Methane - Various sites - 2004+6080018-2418-24200520042  6    
34Ngawha Geothermal2016060?1820122005463-721.23-5HLLM
35Kawerau Central Geothermal2017036 ?18200720053651.33MLLM ?
36Mokai I expansion Geothermal3025018182005200511021.530LML
37Tauhara Geothermal15120-1601818200520051711.63-40L0H
38Kiwi Dairies (cogen)4032024242005200516036LHHL
39Kiwi Dairies (peaker)4035-7024242005200524019LHHL
40Kapuni1580 -160242420052005225-501-37-10LHHL
41SI - Wind Farm60400302420062005110046LLLL
42Manawatu Wind Farm9055030242006200511405.66LLLL
43Tekapo B Upgrade2050n/a242005200511015LLLL
44Manapouri Discharge + Uprate100100480200720051000LL0L
45Huntly E3P40029802424200520053500 6 HLM
46Hawea 30MW scheme301202424200520051900.45LLLL
47TCC 2 or Otahuhu "C"40029803636200620063500 6 HMM
48Wairau Valley Hydro100500-55042 20062006330016MLLL
49Rotokawa II Geothermal7562048 ?3620102006319553-4MLLM
50Pukaki - Hydro4420363620062006210016.5LLML
51Dobson Hydro5727048362008200731700.86.5MLLL
52Putauaki Geothermal75420-83060 ?36-48200820073150-2554-83-5MLLM
53Ngatamariki Geothermal75420-830> 60 ?48201220075125-2304-62-5HLMM
54Hawea 60MW scheme6031548?482008200721600.66.5MLML
55Aqua Stage 1262160060 2009200936002-35MLML
56Luggate265127772 20102008266325-6MLML
57Queensbury220106084 20102008155025-6MLML
58Aqua Stage 2262160090 2012201236002-35MLML

Erratum: Amendments to Power Generation Summary Table

[Added 1 March 2004]

Ref.OpportunityPotential
Capacity
(MW)
Ann.
Output4
(GWh)
6Mangahao Hydro (committed)422
41SI Wind Farm60236
42Manawatu Wind Farm90354
50Pukaki44120
56Luggate90435
57Queensbury180870

1Assumes gas availability.

2For thermal plant Annual Output (GWh) assumes load factors of 10-20%.

3Costs per kWh take into account typical load factors for non-thermal plant (hydro, geothermal and wind). For thermal plant, where the load factors is some cases may be very low (but cannot realistically be predicted) for peaking plant, they take into account fuel and O&M costs but assume the capital cost is recovered at 10% per annum. For the non thermal plant, the costs per kWh are the long term prices at which the projects are considered to be viable. The do therefore take into account project financing and profit, do not include up-front establishment costs.

4For thermal plant Annual Output (GWh) assumes load factors of 10-20%.