Appendix C: Future Unit Costs


Fossil Fuel Electricity Generating Costs

East Harbour Management Services
[ Last Updated 19 December 2005 ]


Tables C1 to C5 give estimated capital costs and efficiencies for 2003, 2012 and 2025 for the various technologies. Tables C6 to C17 give estimated unit electricity costs for 2003, 2012 and 2025. In these tables the expected capital costs and efficiencies from Tables C1 to C5 have been used, but the fuel and O&M costs used are the same as those for the 2003 cases.

It should be noted that efficiencies have been given to one decimal place, not to indicate that degree of precision, but to differentiate between the values of various scenarios and years.

Table C1: Supercritical Pulverized Coal
 Capital Cost $/kWEfficiency %
Technology UptakeTechnology Uptake
YearLowExpectedHighLowExpectedHigh
200318501850185038.338.338.3
201218001800180039.939.939.9
202517301730173040.140.140.1

Figure C1a: Supercritical Pulverized Coal showing Capital Cost

Figure C1a: Supercritical Pulverized Coal showing Capital Cost

Figure C1b: Supercritical Pulverized Coal showing Efficiency

Figure C1b: Supercritical Pulverized Coal showing Efficiency

Table C2: Combined Cycle Gas Turbine
 Capital Cost $/kWEfficiency %
Technology UptakeTechnology Uptake
YearLowExpectedHighLowExpectedHigh
200383083083045.845.845.8
201282082082048.548.548.5
202579079079048.748.748.7

Figure C2a: Combined Cycle Gas Turbine showing Capital Cost

Figure C2a: Combined Cycle Gas Turbine showing Capital Cost

Figure C2b: Combined Cycle Gas Turbine showing Efficiency

Figure C2b: Combined Cycle Gas Turbine showing Efficiency

Table C3: Combined Cycle Advanced Gas Turbine
 Capital Cost $/kWEfficiency %
Technology UptakeTechnology Uptake
YearLowExpectedHighLowExpectedHigh
200394094094049.249.249.2
201294090089049.853.462.3
202594083081049.853.768.8

Figure C3a: Combined Cycle Advanced Gas Turbine showing Capital Cost

Figure C3a: Combined Cycle Advanced Gas Turbine showing Capital Cost

Figure C3b: Combined Cycle Advanced Gas Turbine showing Efficiency

Figure C3b: Combined Cycle Advanced Gas Turbine showing Efficiency

Table C4: Open Cycle Gas Turbine
 Capital Cost $/kWEfficiency %
Technology UptakeTechnology Uptake
YearLowExpectedHighLowExpectedHigh
200363063063031.431.431.4
201263062062031.432.732.7
202563060060031.432.732.7

Figure C4a: Open Cycle Gas Turbine showing Capital Cost

Figure C4a: Open Cycle Gas Turbine showing Capital Cost

Figure C4b: Open Cycle Gas Turbine showing Efficiency

Figure C4b: Open Cycle Gas Turbine showing Efficiency

Table C5: Open Cycle Advanced Gas Turbine
 Capital Cost $/kWEfficiency %
Technology UptakeTechnology Uptake
YearLowExpectedHighLowExpectedHigh
20037207202036.736.736.7
201271066064037.239.951.2
202571059057037.239.951.2

Figure C5a: Open Cycle Advanced Gas Turbine showing Capital Cost

Figure C5a: Open Cycle Advanced Gas Turbine showing Capital Cost

Figure C5b: Open Cycle Advanced Gas Turbine showing Efficiency

Figure C5b: Open Cycle Advanced Gas Turbine showing Efficiency

Table C6: 2003 Electricity Costs (5% Discount Rate, 20 Year Life, $5.00/GJ Gas, $3.50/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.03.40.40.24.9
Combined cycle gas turbine2500.93.90.40.25.3
Open cycle advanced gas turbine2300.74.90.50.16.2
Bituminous supercritical with FGD1602.03.30.90.46.6
Open cycle gas turbine5000.65.50.60.16.8
Table C7: 2003 Electricity Costs (5% Discount Rate, 20 Year Life, $6.00/GJ Gas, $4.00/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.04.00.40.25.6
Combined cycle gas turbine2500.94.60.40.26.1
Bituminous supercritical with FGD2302.03.80.90.47.1
Open cycle advanced gas turbine1600.75.90.50.17.2
Open cycle gas turbine5000.66.60.60.17.9
Table C8: 2003 Electricity Costs (10% Discount Rate, 20 Year Life, $5.00/GJ Gas, $3.50/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.43.40.40.45.6
Combined cycle gas turbine2501.33.90.40.35.9
Open cycle advanced gas turbine2301.04.90.50.36.6
Open cycle gas turbine1600.95.50.60.27.2
Bituminous supercritical with FGD5003.13.30.90.98.2
Table C9: 2003 Electricity Costs (10% Discount Rate, 20 Year Life, $6.00/GJ Gas, $4.00/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.44.00.40.46.2
Combined cycle gas turbine2501.34.60.40.36.6
Open cycle advanced gas turbine2301.05.90.50.37.6
Open cycle gas turbine1600.96.60.60.28.3
Bituminous supercritical with FGD5003.13.80.90.98.6
Table C10: 2012 Electricity Costs (5% Discount Rate, 20 Year Life, $5.00/GJ Gas, $3.50/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4000.93.40.40.24.8
Combined cycle gas turbine2500.83.70.40.25.1
Open cycle advanced gas turbine2300.74.50.50.15.8
Bituminous supercritical with FGD1601.93.20.90.46.4
Open cycle gas turbine5000.65.50.60.16.8
Table C11: 2012 Electricity Costs (5% Discount Rate, 20 Year Life, $6.00/GJ Gas, $4.00/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4000.94.00.40.25.5
Combined cycle gas turbine2500.84.50.40.25.9
Open cycle advanced gas turbine2300.75.40.50.16.7
Bituminous supercritical with FGD1601.93.60.90.46.9
Open cycle gas turbine5000.66.60.60.17.9
Table C12: 2012 Electricity Costs (10% Discount Rate, 20 Year Life, $5.00/GJ Gas, $3.50/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.43.40.40.45.5
Combined cycle gas turbine2501.23.70.40.35.7
Open cycle advanced gas turbine2300.94.50.50.26.1
Open cycle gas turbine1600.95.50.60.27.2
Bituminous supercritical with FGD5003.03.20.90.97.9
Table C13: 2012 Electricity Costs (10% Discount Rate, 20 Year Life, $6.00/GJ Gas, $4.00/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.44.00.40.46.1
Combined cycle gas turbine2501.24.50.40.36.5
Open cycle advanced gas turbine2300.95.40.50.27.0
Open cycle gas turbine1600.96.60.60.28.3
Bituminous supercritical with FGD5003.03.60.90.98.4
Table C14: 2025 Electricity Costs (5% Discount Rate, 20 Year Life, $5.00/GJ Gas, $3.50/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4000.93.40.40.24.8
Combined cycle gas turbine2500.83.70.40.25.1
Open cycle advanced gas turbine2300.64.50.50.15.7
Bituminous supercritical with FGD1601.93.20.90.46.3
Open cycle gas turbine5000.65.50.60.16.8
Table C15: 2025 Electricity Costs (5% Discount Rate, 20 Year Life, $6.00/GJ Gas, $4.00/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4000.94.00.40.25.4
Combined cycle gas turbine2500.84.40.40.25.8
Open cycle advanced gas turbine2300.65.40.50.16.6
Bituminous supercritical with FGD1601.93.60.90.46.8
Open cycle gas turbine5000.66.60.60.17.9
Table C16: 2025 Electricity Costs (10% Discount Rate, 20 Year Life, $5.00/GJ Gas, $3.50/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.33.40.40.35.3
Combined cycle gas turbine2501.23.70.40.35.6
Open cycle advanced gas turbine2300.84.50.50.26.0
Open cycle gas turbine1600.85.50.60.27.2
Bituminous supercritical with FGD5002.93.20.90.97.8
Table C17: 2025 Electricity Costs (10% Discount Rate, 20 Year Life, $6.00/GJ Gas, $4.00/GJ Bituminous Coal, 90% Load Factor)
TechnologyMWCost c/kWh
CapitalFuelO&MOtherTotal
Combined cycle advanced gas turbine4001.34.00.40.36.0
Combined cycle gas turbine2501.24.40.40.36.4
Open cycle advanced gas turbine2300.85.40.50.26.9
Bituminous supercritical with FGD1602.93.60.90.98.2
Open cycle gas turbine5000.86.60.60.28.3